|
European
Southern Observatory New Technology Telescope |
| General : | |||||
| Observations : |
BOB executes the template files along with the specified parameters as passed on to him by P2PP (Phase 2 Preparation Program) in Visitor Mode, or from the OT in Service Mode (Observing Tool). While it is possible to drive each of the subsystems independently (e.g., set-up the instrument for low resolution spectro using the instrument control panel), this is reserved for testing and engineering purposes, as this is much less efficient.
As opposed to conventional observing
mode, in the new NTT, the TIO (Telescope / Instruments Operator) will operate
both the telescope and the instrument through the BOB interface. He will assist
the observer with all the details of the observing. The astronomer, whether as
a visitor (classical observing) or an NTT staff member (in the case of service
observing) can then concentrate on the decisions requiring his/her scientific
expertise.
The Prop. column refer to the documents needed for the preparation of your Proposal for Observing Time, and you should read those marked in the Obs. column before coming to the telescope to perform your observations. The Service Obs. column lists the pages related to Service Observing (which is currently not offered).
The Technical column indicate the level of the document:
| Documentation Table | |||||
| Prop. | Obs. |
|
| ||
| General Documentation | |||||
Observing
with ESO telescopes
|
|
| |||
Proposal
(Phase 1) Preparation and Submission
| | | |||
| Instrument Pages (including manuals): |
|
|
|
| |
ESO NTT and VLT Exposure Time Calculators
|
| |
| | |
The
Scheduling Tool
|
| |
| | |
|
Phase II Proposal Preparation:
| | | | ||
Observing
Tool (OT)
|
| | |||
Broker for Observation Blocks (BOB)
|
| |
| ||
Standard
Calibrations and Calibration Plan
|
| | | | |
Frequently Asked Questions, hints and tips
|
|
| |||
| + |
+ | + |
| |
| Policies | |||||
Policy for Target of Opportunity Observations (ToO)
|
| ||||
| Technical Documentation | |||||
(visitors can safely ignore these) | |||||
| CCD Control Software |
| ||||
| Instrument Processes |
| ||||
| Instrument Control: EMMI - SUSI2 - SOFI |
| ||||
| Telescope Control Software |
| ||||
| TCS Workstation Processes |
| ||||
| Inter-processes Communication |
| ||||
| Send
comments to: NTT Webmasters <nttweb@www.ls.eso.org> Last Update: July 16, 2000 |